In accordance with the stipulations set forth in WAC 197-11-340 and WAC 478-324-140, the University of Washington hereby issues a public announcement of: DECISION OF NON-SIGNIFICANCE
Project Title: Renovation of Husky Soccer Field
Proponent/Lead Agency: UW–Seattle Campus
Comment Period Ends: April 4, 2025
Overview: The anticipated project at the University of Washington aims to upgrade the turf of the Husky Soccer Field to enhance drainage and install new lighting fixtures to improve energy efficiency and optimize directional lighting for the field, while minimizing off-field illumination.
Site Location: The area designated for the project is primarily enclosed by the Husky Outdoor Track to the north, Canal Rd NE to the east, the Husky Baseball Field to the south, and Walla Walla Road NE and Lot E18 to the west.
Contact Individual: Julie Blakeslee, Planner at UW; UW Facilities; Box 359571; Seattle, WA 98195-2205; [email protected]